Project lifecycle
Industrial projects bring together many suppliers, disciplines and test stages. Our project management service keeps the technical requirements in front of everyone, from the first specification to the final handover pack, so that what is delivered is what was specified.
Stage 01 of 07
The early engineering stage that defines scope, design basis and cost before detailed engineering and procurement.
What we do
Project Management · Functional Safety · OT Cybersecurity
Stage 02 of 07
Detailed design for the safety, control and network systems, documented and coordinated across disciplines.
What we do
Functional Safety · OT Cybersecurity · System Integration
Stage 03 of 07
Selecting the right vendors and checking equipment at the supplier before it ships.
What we do
Project Management · System Integration
Stage 04 of 07
E&I field execution on site, supervised and coordinated with the rest of the build.
What we do
E&I Field Execution · Project Management
Stage 05 of 07
Verifying the installed systems against the specification, the safety requirements and the security design.
What we do
Functional Safety · OT Cybersecurity · E&I Field Execution
Stage 06 of 07
Bringing systems into operation, with troubleshooting and validation before handover.
What we do
System Integration · Functional Safety · Project Management
Stage 07 of 07
A complete, documented system handed over to operations.
What we do
Project Management · OT Cybersecurity
What we manage
Project stages
Technical specification review, engineering document review, and drawing and design coordination.
Vendor evaluation and selection, so equipment and services match the specification.
Construction supervision, installation coordination, and inspection and testing coordination.
FAT and SAT management and commissioning support.
Project documentation, as-built documentation and final handover support.
Why Konisys
Our project managers work with the same teams that deliver safety, cybersecurity, E&I and automation, so technical requirements are followed through from specification to handover.
Project coordination is backed by engineers who know the systems being delivered.
Specification, installation, testing and handover are linked, not split between separate contractors.
Documentation and as-built records are part of the scope, not an afterthought.
FAQ
Front-End Engineering Design (FEED) is the early engineering stage that defines scope, design basis and cost before detailed engineering and procurement.
A Factory Acceptance Test (FAT) checks equipment at the supplier’s premises before shipment. A Site Acceptance Test (SAT) checks it after installation at the project site.
It means overseeing installation work on site to confirm it follows the specification and drawings, and coordinating the installation, inspection and testing activities.
They record the system as it was actually installed, including any changes made during construction, and are part of the final handover.
Tell us which stages you need. Our services span the project lifecycle, from specification review to final handover, so support can be matched to your project.
Related pages
Tell us about your project and we will respond with the right mix of safety, cybersecurity, execution and automation support.